# BESS Quote Comparison Sheet

CIMC ENRIC Energy Systems · Version 1.0 · 7 October 2026

Purpose: share one requirement with suppliers and compare responses on the same basis. Planning aid; not a technical design or commercial quotation.

Project reference: ______  Country / site: ______  Buyer / EPC: ______

Application: ______  Load profile attached: yes / no

Required net power and measurement point: ______ kW at ______

Required energy: ______ kWh; nominal DC / usable AC; beginning of life / warranty milestone: ______

Required duty / discharge profile: ______  Voltage / frequency: ______

Site environment / grid availability / existing PV or generation: ______

For each row, identify included, excluded, optional or unresolved scope. For an exclusion, identify its owner and price before claiming an installed-project total.

| Item | Requirement | Supplier A: scope / cost / responsibility | Supplier B: scope / cost / responsibility |
|---|---|---|---|
| Battery and BMS | Energy basis, usable energy, operating limits | | |
| PCS | Continuous power and environmental conditions | | |
| EMS and integration | Functions and grid/PV/generator interfaces | | |
| Transformer / switchgear / protection | Voltage, relays, grounding, cabling | | |
| Cooling / enclosure / auxiliary supply | Site conditions and auxiliary accounting | | |
| Safety documentation / installation requirements | Offered configuration and destination | | |
| Logistics / delivery terms / taxes | Currency, date and named delivery basis | | |
| Foundations / unloading / electrical site work | Included work and responsible party | | |
| Commissioning / FAT / SAT / training | Acceptance method and handover criteria | | |
| Warranty / spares / service | Capacity, throughput, conditions and contacts | | |
| Options / exclusions | Scope, owner and any missing price | | |
| Comparable total / energy denominator | Same scope and same energy definition | | |

Illustrative sizing only: 500 kW / 1.2 MWh gives 1,200 kWh ÷ 500 kW = 2.4 h theoretically. Confirm usable net AC energy and actual duty before relying on a runtime figure.

Verified system information and project inquiry:

https://cimcenergysystem.com/solutions/bess-microgrid

https://cimcenergysystem.com/contactus

Article 5 is a draft at the time this sheet was prepared; the published article link will be added when publication is confirmed.