Power demand in. Solution out.

LNG Virtual Pipeline + 25.2 MW modular gas power plant 14 × 1.8 MW units · N+1 planning · 72-hour LNG storage
RECOMMENDED ENERGY SOLUTIONLNG Virtual Pipeline + Modular Gas Power PlantN+1 configuration · 72-hour LNG storage
01

Project assumptions

Select gas supply route

Inputs with the greatest impact on results.

LNG selected — confirm plant availability, delivered price, route distance, truck capacity and storage autonomy.

Site & operating profile

Currency selection changes the display symbol only. Enter fuel prices and the local-currency-per-USD exchange rate for the project country.

Net output 20.0 MWAnnual generation 158.4 GWh
CIMC BUDGETARY GAS SOLUTION CAPEX ANCHOR$8.75mBudgetary planning anchor for 25,000 kW installed capacity

Budgetary planning anchor only — not a quotation. Final equipment scope, site conditions, balance of plant, logistics and taxes require a reviewed CIMC proposal.

Request CIMC pricing →

Fuel prices & full operating cost

Diesel reference (optional benchmark)

LNG generation

Enter the LNG price delivered to the project site. Do not add road transport again if it is already included in the supplier quote.

Equivalent landed gas price: — /Nm³

Phase 2 — incremental investment case

Greenfield gas basis: Diesel baseline CAPEX is set to zero. Diesel operating cost remains a reference benchmark only; it is not treated as an avoided investment.

Optional green power & hybrid microgrid

Gas-only mode — no renewable CAPEX or renewable generation offset is included.
02

Feasibility result

Current prices · planned load

TOTAL SAVINGper kWh generated
ANNUAL NET SAVING
SAVINGS RATEvs optional diesel benchmark
SAVINGS-ONLY MODE · CAPEX, NPV, IRR and full energy-station profitability are reserved for the reviewed Phase 2 investment case.
A

Gas requirement & logistics

DESIGN BASIS
CONTRACT GAS VOLUME
GAS FLOW
LNG DEMAND
ROAD LOGISTICSincluding reserve
Theoretical method Equipment method Contract volume

Engineering estimate. Final contract volume must use selected engine curves, ambient derating, gas composition and the confirmed operating profile.

ONE CIMC ENRIC VALUE CHAINSelected fuel route highlighted · one brand from gas handling to power island
ISOTank containersLNGRoad tankersCNGTube trailersSTORAGESmall–large tanksPLANTLiquefaction plantsHUBMother & daughter stationsAPGAssociated-gas recoveryPRE-TREATCustom gas pretreatment skidsBIOGASBiogas upgrading skidsSKIDPressure regulation & metering skidsMARINELNG / oil-gas vessels
B

Operating cost benchmark

OPTIONAL DIESEL REFERENCE
DIESEL REFERENCE
Fuel
Operating cost
Annual total
LOWER COST
LNG
Delivered fuel
Operating cost
Annual total
C

Budgetary power-generation investment

PLANNING BASIS
PAYBACK CAPEX BASISGas power-generation system CAPEX basis

Payback uses the budgetary gas power-generation system CAPEX against annual diesel-versus-gas operating savings. Complete project EPC is excluded.

D

Scenario range

SENSITIVITY
※ POWER-GENERATION SIMPLE PAYBACK

Incremental CAPEX Annual saving

This is the simple payback of the gas power-generation system, not the payback of the complete project EPC. Annual saving = annual diesel cost (fuel + O&M) − annual gas cost (fuel + O&M); annual O&M for both options is already included in the cost-per-kWh inputs.

CASELOADSAVING / YEARPAYBACK
CAPACITY SWEET SPOTPurchase capacity vs. power-generation simple payback · annual ROI shown on each point
Purchase capacity and simple payback curveIndicative curve showing how modular gas power-generation capacity affects simple payback and annual return on investment.Purchase capacity (MW)Simple payback (months)Annual ROI (%)

Indicative sweet spot: the highlighted point is the lowest estimated power-generation payback under the current fuel price, load and budgetary CAPEX assumptions. It excludes complete EPC, off-site pipeline works and gas-treatment scope.

Primary sensitivity: delivered gas price, followed by diesel price and annual operating hours. Date-stamp all prices before customer use.

NEXT STEP

Request a reviewed report / project proposal

Your calculation will be attached to the CRM lead as an initial project brief, so the CIMC sales team can respond with the right technical and commercial questions.

Channel partner referral recognized. Your inquiry will be attributed to the referring CIMC channel partner for follow-up.
This sends a preliminary estimate, not a quotation. A CIMC salesperson will validate the fuel route, scope and price.
PHASE 2 · AFTER SUBMISSION

From estimate to reviewed proposal

DESIGNED CUSTOMER PDF

Project economics + capacity curve + CIMC ENRIC capability story

Download a real PDF directly, not a webpage print. It records this customer session, reproduces the capacity/payback chart and connects the result to CIMC ENRIC's source-to-power delivery capability.

Choose report order
PRELIMINARY ESTIMATE — PRINTING IS AVAILABLE AFTER CIMC COMMERCIAL REVIEW.
DOWNLOAD STANDARD COMPANY PROFILE →
CHANNEL-PROTECTED PROJECT
This assessment link belongs to your referring CIMC ENRIC channel partner. Submit the project brief here and the same partner attribution will remain with the CRM record and reviewed report.
CIMC ENRICPROJECT ENERGY ROUTE · PRELIMINARY REVIEW
GAS-TO-POWER PROJECT ASSESSMENT

A decision brief built from this customer session.

The selected fuel route, local market quotation, operating profile and commercial assumptions below are recorded directly from the calculator. This is a designed assessment document—not a webpage capture.

Review reference: PendingGenerated: · Direct assessment
CUSTOMER-SELECTED FUEL ROUTE
LOCAL DELIVERED PRICE ENTEREDEquivalent landed gas price: —
AVERAGE NET OUTPUTSelected operating basis
ANNUAL GENERATION h/day operating profile
ANNUAL OPERATING SAVING
POWER-GENERATION PAYBACK※
Project identity and calculation basis
PROJECT LOCATION
INSTALLED CAPACITY MW
POWER BASIS
NET OUTPUT TARGET MW
LOAD FACTOR%
CALCULATION CURRENCY

Decision status. Use this page to confirm that the correct gas route and local price basis were selected before interpreting savings. Supplier capacity, gas composition, tax treatment, delivery distance and final scope remain subject to CIMC ENRIC engineering and commercial review.

[email protected] · Tel / WhatsApp +86 15618649185 · cimcenergysystem.comPrepared through an authorized CIMC ENRIC channel partner · cimcenergysystem.comPROJECT ASSESSMENT 1 / 3
CIMC ENRICCUSTOMER INPUT RECORD · SESSION TRACE
ASSUMPTIONS LEDGER

Every material input used in the calculation.

This page preserves the customer’s calculation path so the sales and engineering teams can review the same basis without re-entering or guessing project information.

01 · POWER PROFILE

Project location
Power basis
Installed capacity MW
Net output target MW
Average load factor%
Operating hours h/day
Operating days days/yr
Annual generation

02 · FUEL & GAS QUALITY

Selected fuel route
Local delivered quote
Equivalent local gas price
Equipment gas rate Nm³/kWh
Gas LHV kWh/Nm³
Planning efficiency reference~%*
Design gas reserve%
Gas O&M allowance /kWh

03 · LOGISTICS & STORAGE

LNG gas equivalent Nm³/t
LNG truck payload t
CNG tube payload Nm³
CNG density kg/Nm³
Logistics reserve%
LNG tank option
Storage target days
Calculated delivery

04 · COMMERCIAL & MICROGRID

Diesel benchmark /L
Diesel consumption L/kWh
Diesel O&M /kWh
Gas CAPEX basisUSD
Local currency / USD
Discount rate%
Project life years
Microgrid mode
PV / wind / battery / /
SESSION TRACE · Quote basis · Market · Currency · Source Direct assessment. Values remain editable until the reviewed report is issued.
[email protected] · Tel / WhatsApp +86 15618649185 · cimcenergysystem.comPrepared through an authorized CIMC ENRIC channel partner · cimcenergysystem.comPROJECT ASSESSMENT 2 / 3
CIMC ENRICENGINEERING DEMAND · ECONOMIC SCREENING
CALCULATION RESULT

The site implication of the selected fuel route.

Fuel route: Customer quote: ·
CONTRACT GAS VOLUME
DESIGN FLOW
GAS RATE
DELIVERY / STORAGE
Operating-cost benchmark

Diesel reference

Fuel
O&M
Annual cost

Selected gas route

Fuel
O&M
Annual cost

CAPEX BASIS
ANNUAL SAVING
SIMPLE PAYBACK※
10-YEAR NPV
Scenario range
CASELOADANNUAL SAVINGPAYBACK
Conservative
Base case
Optimistic

Fuel-route logistics. Storage, delivery rhythm and reserve capacity must be verified against the selected route and site conditions.

※ Scope of payback. This is the simple payback of the gas power-generation system using annual diesel-versus-gas operating savings. It is not the payback of complete project EPC. Annual fuel and O&M assumptions for both benchmark options are included; unentered treatment, off-site pipeline, civil, tax and financing scope is excluded.

[email protected] · Tel / WhatsApp +86 15618649185 · cimcenergysystem.comPrepared through an authorized CIMC ENRIC channel partner · cimcenergysystem.comPROJECT ASSESSMENT 3 / 3
CIMC ENRICINTEGRATED ENERGY SYSTEMS
COMPANY CAPABILITY PROFILE

From molecules to reliable power.

CIMC ENRIC connects primary energy, storage and transport, fuel conditioning, modular generation, BESS/EMS and site delivery around real operating conditions.

ResourceAPG, biogas, PNG, LNG, CNG and renewable generation.
ConditioningClean, dry, compress, regulate, meter and protect.
Storage & logisticsTanks, ISO, tankers, trailers, marine and site buffer.
ϟPower islandAM20 to AM1800 packages and modular MW blocks.
ControlBESS, EMS, dispatch, protection and remote monitoring.
Site deliveryOilfield, mining, industry, telecom and critical loads.
The system is defined by four decision gates
FUEL QUALITYCan the gas run the selected equipment?
DELIVERED COSTWhat is the real landed energy price?
UPTIMECan supply and storage sustain the load?
SCALABILITYCan the project expand in modular blocks?
EXECUTIONCan equipment, logistics and site works connect?
LIFECYCLEWho operates, services and expands the system?
[email protected] · Tel / WhatsApp +86 15618649185 · cimcenergysystem.comPresented by your authorized CIMC ENRIC channel partner · cimcenergysystem.comCOMPANY PROFILE 1 / 3
CIMC ENRICCAPABILITY MAP
ONE COORDINATED DELIVERY ROUTE

Infrastructure around the power island.

01 · GAS POWER GENERATION

Modular power island

AM20, AM100, AM250, AM600, AM1200 and AM1800 planning; N+1 configuration, electrical integration, commissioning and O&M.

02 · APG & BIOGAS

From raw gas to usable fuel

Associated-gas recovery, separation, dehydration, sweetening, compression and metering; biogas cleaning, upgrading and buffer storage.

03 · LNG & CNG INFRASTRUCTURE

Virtual-pipeline systems

LNG liquefaction, ISO tanks, road tankers, regasification, CNG mother/daughter stations, tube trailers and pressure regulation.

04 · STORAGE & LOGISTICS

Operating rhythm on site

Small, medium and large tanks, 60 m³ standard planning options, ISO rotation, truck movements and reserve-volume assessment.

05 · BESS & EMS

Control and short-duration resilience

Containerized BESS, dispatch control, peak support, black-start logic and coordination with firm gas generation.

06 · PROJECT INTEGRATION

From screening to lifecycle service

Pre-feasibility, equipment selection, gas-system concept, EPC interface, shipment, installation, commissioning, spares and expansion.

APG / BiogasLocal resource → treatment skid → stable fuel gas → modular power.
LNG / CNGVirtual pipeline → site buffer → regasification / regulation → modular power.
Pipeline gasSite interface → metering and protection → multi-unit power island.
[email protected] · Tel / WhatsApp +86 15618649185 · cimcenergysystem.comPresented by your authorized CIMC ENRIC channel partner · cimcenergysystem.comCOMPANY PROFILE 2 / 3
CIMC ENRICPROOF · DELIVERY · NEXT STEP
BUILT FOR REAL SITES

Representative project patterns.

OILFIELD INTEGRATED ENERGYField resource to controlled site powerGas collection, conditioning, modular generation, BESS/EMS and lifecycle operation around oilfield loads.
25MW PIPELINE GAS POWERIndustrial-scale multi-unit power islandPipeline gas, modular power blocks and IPP/PPA project logic for dependable local generation.
10MW LNG EXPANSIONStaged LNG-to-power growthLNG facility, AM1200 blocks and phased capacity expansion aligned with the site load.
APG POWER + MOBILE BESSFirm energy with flexible supportAssociated-gas power combined with transportable BESS for field resilience and controlled dispatch.
How a project moves forward
01 · SCREENLocation, load, fuel route and timeline.
02 · DEFINEGas quality, storage, redundancy and scope boundary.
03 · CONFIGUREEquipment blocks, logistics and electrical interface.
04 · REVIEWBudgetary economics, assumptions and risks.
05 · DELIVERManufacture, ship, install and commission.
06 · SUPPORTO&M, spares, monitoring and expansion.
Start with the facts. We will structure the first engineering route.Share the project location, required MW, operating hours, available fuel route and target timeline.[email protected] · Tel / WhatsApp +86 15618649185 · https://cimcenergysystem.comContinue through your referring CIMC ENRIC channel partner · https://cimcenergysystem.com
Project calculator: cimcenergysystem.com/gas-to-power-calculatorCOMPANY PROFILE 3 / 3

Gas-to-Power feasibility for industrial and off-grid projects

This engineering pre-feasibility tool connects power demand with gas quantity, fuel logistics, modular generator configuration, operating cost and savings against diesel generation. It is designed for early screening before CIMC ENRIC verifies the gas source, gas quality, site conditions and project scope.

What can this Gas-to-Power calculator estimate?

It estimates net power output, annual generation, gas flow in Nm³/h, Nm³/day and MMSCFD, LNG tonnes and truck movements where relevant, modular generator combinations, fuel cost per kWh and annual operating savings.

Which gas sources can be evaluated?

The calculator supports associated petroleum gas (APG), biogas, CNG tube-trailer supply, LNG virtual pipelines and pipeline natural gas (PNG). Each route has a different price basis, treatment scope, logistics requirement and verification risk.

Does the displayed payback include the complete project EPC?

No. It is the simple payback of the budgetary gas power-generation system, using annual diesel cost minus annual gas cost. Fuel and non-fuel O&M for both options are included, while unentered civil works, off-site pipelines, gas-treatment systems, financing and complete EPC scope are excluded.

What can CIMC ENRIC supply for a Gas-to-Power project?

CIMC ENRIC can review associated-gas recovery and pretreatment, biogas upgrading, LNG and CNG storage and transport, tank containers, road tankers, tube trailers, liquefaction, regasification, pressure regulation and modular gas power-generation systems through one coordinated project interface.

CIMC ENRIC Energy Systems provides equipment and project-integration support. Public or customer-entered data does not confirm gas rights, commercial availability, gas quality, delivered price or final equipment performance; these items require project-specific review.

Indicative pre-feasibility estimate only. Not a quotation, performance guarantee or confirmation of gas availability. Validate prices, equipment curves, logistics and site conditions before proposal issue.