Skip to Content
Upcoming event 6th International GNL GLOBAL Forum 2026 | Santiago, Chile | 19-21 October | CIMC ENRIC Sponsor View event detailsEvent details

CIMC manufacturing and delivery

Energy storage manufacturing. Modular digital infrastructure.

Our project approach connects energy equipment with the relevant CIMC manufacturing and delivery capabilities. Explore the evidence behind the network and plan the equipment, interfaces and local work your site needs.

A five-base energy storage network

The June 2025 CIMC Energy Storage presentation described four major production bases. The Baotou project commissioning in September 2026 was reported as the fifth base. These references describe the CIMC storage network; they are not the annual output of CIMC Enric Energy Systems (Shanghai) Co., Ltd.

4 bases

June 2025 network

Qingdao, Nantong, Yangzhou and Fujian were identified in the storage presentation.

Source: CIMC Energy Storage English presentation, June 2025, slide 12.
40+ GWh

Reported production capacity

Annual production capacity stated for the four-base network in that presentation.

Historical capacity reference; not current-year production or confirmed project availability.
CIMC Energy Storage four-base network in the June 2025 presentation
Historical reference: CIMC Energy Storage English presentation, June 2025, slide 12. The map shows the four-base network at that date; the September 2026 Baotou fifth-base update is listed separately above. Download the source slide →

The 2025 production-capacity figure and the Baotou delivery-capability figure have different dates and descriptions. Project capacity, delivery slots and supply scope should be confirmed for the actual order.

From storage equipment to a working energy system

  • Equipment: define battery, PCS, enclosure, cooling, fire protection and control scope for the selected configuration.
  • Integration: confirm voltage, operating modes, generator interfaces, protection and dispatch requirements.
  • Delivery: agree factory checks, shipping, local site works, installation and commissioning responsibilities.

Explore containerized BESS → · Plan the microgrid route →

Modular data centers: the complete site perspective

CIMC Digital Power publishes references covering factory-built modules, data center construction and global project delivery. These are that company's published references, distinct from the projects of CIMC Enric Energy Systems (Shanghai) Co., Ltd.

17,000

Modules

Published modular delivery reference.

540,000 m²

Construction area

Published construction-area reference.

52,000

Racks

Published rack reference.

Read CIMC Digital Power's published references →

A project can bring together fuel preparation, generation, BESS, electrical interfaces, cooling and modular buildings. The responsible suppliers, local partners and performance requirements are agreed within the project scope.

Explore data center power and cooling →

Gas generation equipment

The AM and SL product routes support discussions about compact modular generation and larger units for long-hour operation. The previously stated up-to-4-GW annual equipment-capacity outlook is a planning estimate; it is not reported annual production, an order commitment or electricity generated.

Explore the AM series → · Explore SL2000-NG →

Plan your supply and delivery scope

Share the country, site load, fuel or grid conditions, required operating modes and delivery scope. We can then organize the relevant equipment and manufacturing references for your project review.

Discuss your project →

References reviewed: 4 October 2026. The four-base storage reference is from the supplied CIMC Energy Storage English presentation dated June 2025, slide 12. Contact us to discuss the applicable product and factory documents.