June 2025 network
Qingdao, Nantong, Yangzhou and Fujian were identified in the storage presentation.
Source: CIMC Energy Storage English presentation, June 2025, slide 12.CIMC manufacturing and delivery
Our project approach connects energy equipment with the relevant CIMC manufacturing and delivery capabilities. Explore the evidence behind the network and plan the equipment, interfaces and local work your site needs.
The June 2025 CIMC Energy Storage presentation described four major production bases. The Baotou project commissioning in September 2026 was reported as the fifth base. These references describe the CIMC storage network; they are not the annual output of CIMC Enric Energy Systems (Shanghai) Co., Ltd.
Qingdao, Nantong, Yangzhou and Fujian were identified in the storage presentation.
Source: CIMC Energy Storage English presentation, June 2025, slide 12.Annual production capacity stated for the four-base network in that presentation.
Historical capacity reference; not current-year production or confirmed project availability.Annual storage-system delivery capability reported at the new base. The commissioning event took place on 16 September 2026.
CNR commissioning report · 18 September 2026 →The 2025 production-capacity figure and the Baotou delivery-capability figure have different dates and descriptions. Project capacity, delivery slots and supply scope should be confirmed for the actual order.
CIMC Digital Power publishes references covering factory-built modules, data center construction and global project delivery. These are that company's published references, distinct from the projects of CIMC Enric Energy Systems (Shanghai) Co., Ltd.
Published modular delivery reference.
Published construction-area reference.
Published rack reference.
Read CIMC Digital Power's published references →
A project can bring together fuel preparation, generation, BESS, electrical interfaces, cooling and modular buildings. The responsible suppliers, local partners and performance requirements are agreed within the project scope.
The AM and SL product routes support discussions about compact modular generation and larger units for long-hour operation. The previously stated up-to-4-GW annual equipment-capacity outlook is a planning estimate; it is not reported annual production, an order commitment or electricity generated.
Share the country, site load, fuel or grid conditions, required operating modes and delivery scope. We can then organize the relevant equipment and manufacturing references for your project review.
Discuss your project →References reviewed: 4 October 2026. The four-base storage reference is from the supplied CIMC Energy Storage English presentation dated June 2025, slide 12. Contact us to discuss the applicable product and factory documents.