Skip to Content
Upcoming event 6th International GNL GLOBAL Forum 2026 | Santiago, Chile | 19-21 October | CIMC ENRIC Sponsor View event detailsEvent details
Home / Solutions / LNG infrastructure
CIMC EnTech · Energy engineering

LNG infrastructure.
Engineered from
the start.

Planning a receiving terminal, a storage project or an expansion? Bring engineering into the conversation early, with CIMC EnTech.

1983Engineering heritage PMC / EPCProject-based scope LNGTerminals · storage · liquefaction
Aerial view of the Guangdong East LNG receiving station in China, with cryogenic storage tanks, process area and marine jetty
Guangdong East LNG receiving station, China. EnTech reference scope: outbound transmission capacity expansion EPC; brochure records completion in 2024.
A project starts before procurement

Define the infrastructure.
Connect the delivery stages.

CIMC Enric Engineering Technology Co., Ltd. (CIMC EnTech), formerly YPDI, was established in 1983 and joined CIMC in 2011. Its published services span the engineering lifecycle below.

CIMC EnTech company office shown in its engineering brochure
CIMC EnTech · company profile image from the supplied brochure.
  1. 01

    Consultation

    Discuss project needs, constraints and the engineering scope.

  2. 02

    Design

    Develop the agreed technical design and coordinate interfaces.

  3. 03

    Procurement

    Align equipment and materials with the project requirements.

  4. 04

    Construction management

    Coordinate site delivery within the contracted responsibilities.

  5. 05

    Commissioning

    Support the agreed commissioning and handover activities.

PMC/EPC arrangements and specific study or FEED deliverables are agreed for each project. Start with your current stage and the work package you need.

From receiving point to downstream users

Make the system interfaces visible.

Use these blocks to define an initial project conversation. The required facilities and contracting boundaries depend on your site and operating model.

01 / RECEIVE

Terminal interfaces

Receiving and unloading interfaces, site conditions and the connection to storage.

02 / STORE

Cryogenic storage

LNG storage volume, tank arrangements and integration with the wider facility.

03 / SEND OUT

Gas supply interfaces

Regasification and send-out requirements, distribution connections and expansion constraints.

04 / SERVE

Downstream demand

Gas networks, industrial users and gas-to-power applications, with the utilities they need.

Across every block: utilities · controls · safety interfaces · existing facilities · local approval requirements
Gas pipeline equipment package illustrated in the CIMC EnTech Genser project reference
The detail behind an engineering interface

Equipment, piping and control belong in the same conversation.

Define pressure, flow, utilities and connection responsibilities alongside the wider terminal or gas supply scope.

Equipment image accompanying the Genser pipeline project reference in the EnTech brochure.
Europe · Southeast Asia · South America

Different regions.
A project-specific starting point.

For EPC contractors, developers and asset owners: select the regional route closest to your project and tell us what you are planning.

Europe

Terminal expansion & send-out interfaces

For EPCs and owners defining a new terminal, an expansion or an onshore engineering package.

  • Clarify storage, send-out and utility scope.
  • Plan interfaces with existing assets and local design teams.
  • Align the engineering package with the project approval route.
Discuss a project in Europe →
Southeast Asia

Receiving capacity to downstream supply

For projects connecting LNG receiving and storage with industrial or power-sector gas demand.

  • Map the receiving point and downstream users.
  • Compare distribution and gas-to-power interfaces.
  • Define site, utilities and phased capacity needs.
Discuss a project in Southeast Asia →
South America

Coastal reception to inland users

For developers and EPCs connecting LNG infrastructure with gas distribution, industry or power.

  • Define the terminal, storage and distribution boundaries.
  • Connect the gas supply route to the actual demand profile.
  • Coordinate logistics, site constraints and local approvals.
Discuss a project in South America →

Share your project country and current stage to begin the discussion on technical standards, local collaboration and delivery scope.

Reference experience in China

Engineering scale,
with the work scope made clear.

Selected references from the CIMC EnTech English brochure. Each card identifies the reported package.

Aerial view of Huizhou LNG receiving station and its full-containment storage tanks
Huizhou LNG receiving station · storage tank reference
Huizhou · LNG storage
3 × 200,000 m³

Full-containment LNG tanks

Prestressed concrete full-containment storage tanks at the Huizhou LNG receiving station.

Brochure project period: 2021–2024. The reference shown here concerns the storage tanks.
Guangdong East LNG receiving station aerial view
Guangdong East · outbound transmission capacity expansion EPC
Guangdong East · Terminal expansion
Send-out EPC

Outbound transmission capacity expansion

An LNG receiving station expansion package focused on outbound transmission capacity.

Brochure records completion in 2024. This package is distinct from the entire receiving station.
Full-containment LNG tank and piping at the Lvsi Port terminal expansion project
Lvsi Port · LNG terminal expansion EPC
Lvsi Port · Terminal expansion
160,000 m³

Storage & supporting infrastructure

Terminal expansion EPC including a full-containment LNG tank, public utilities and supporting infrastructure.

Brochure records commissioning on 21 November 2018.

A wider engineering portfolio, in pictures.

Work with the project team

Build the cooperation
around a defined engineering package.

Bring your project context.

Your country, site, project stage, capacity needs and target schedule help define the initial discussion. Existing drawings and technical requirements can follow through an agreed sharing process.

Send a project outline →

Agree the scope and interfaces.

Discuss engineering, procurement, construction management and commissioning responsibilities alongside the owner and local EPC or design team. Applicable standards, permitting and local design acceptance form part of the project review.

Pipeline workers welding pipe in the Genser natural gas pipeline project reference in Ghana
Genser natural gas pipeline project, Ghana · construction photograph from the EnTech brochure.
Beyond the receiving terminal

Connect the gas route.
Coordinate the site work.

The Genser reference covers natural gas pipeline design, procurement and installation in Ghana. The brochure lists three project phases:

Phase I · 78.5 km Phase II · 168 km Phase III · 105 km

For a new project, define the terminal, pipeline and downstream interfaces together with the relevant project teams.

Discuss your engineering package →
Questions before a project discussion

What an EPC team needs to know.

Can CIMC EnTech support an LNG project before equipment procurement?

Its published capability includes consultation and engineering design, alongside procurement, construction management and commissioning. Share your project stage and requested engineering scope so the appropriate team can review the next step. A specific feasibility or FEED deliverable package is agreed project by project.

How can an EPC contractor collaborate with CIMC EnTech?

Begin with a defined work package, technical requirements and an interface list. Engineering, procurement, construction management and commissioning responsibilities can then be discussed around the contract scope. Local permitting, design acceptance and site responsibilities must be coordinated with the project owner and qualified local parties.

Do project references include terminal expansion and send-out infrastructure?

Yes. The brochure lists the Guangdong East LNG receiving station outbound transmission capacity expansion EPC and the Lvsi Port LNG terminal expansion EPC. The referenced work packages differ; a reference to one package does not mean EnTech delivered the entire terminal.

What should we provide for an initial LNG infrastructure discussion?

Provide the project country and site, your role, current stage, intended LNG throughput, storage volume and send-out requirements where known. Include existing facilities, downstream demand, utility constraints and your target decision date. Confidential technical documents can follow after the sharing process is agreed.

Can we discuss projects in Europe, Southeast Asia or South America?

Yes. This page provides a project inquiry route for EPCs, developers and owners in all three regions. The applicable technical standards, local partners, approval process and delivery responsibilities are reviewed for each project; the regional inquiry route is not a claim of an existing local project reference.

* Required. Submitting an inquiry starts a project discussion; it is not a quotation or a delivery commitment. We use these details to respond to your project inquiry.

Capability source: CIMC EnTech English brochure supplied for this page. Content reviewed 8 October 2026.
CIMC EnTech company website ↗ CIMC ENRIC Energy Systems capabilities →