Terminal interfaces
Receiving and unloading interfaces, site conditions and the connection to storage.
Planning a receiving terminal, a storage project or an expansion? Bring engineering into the conversation early, with CIMC EnTech.
CIMC Enric Engineering Technology Co., Ltd. (CIMC EnTech), formerly YPDI, was established in 1983 and joined CIMC in 2011. Its published services span the engineering lifecycle below.
Discuss project needs, constraints and the engineering scope.
Develop the agreed technical design and coordinate interfaces.
Align equipment and materials with the project requirements.
Coordinate site delivery within the contracted responsibilities.
Support the agreed commissioning and handover activities.
PMC/EPC arrangements and specific study or FEED deliverables are agreed for each project. Start with your current stage and the work package you need.
Use these blocks to define an initial project conversation. The required facilities and contracting boundaries depend on your site and operating model.
Receiving and unloading interfaces, site conditions and the connection to storage.
LNG storage volume, tank arrangements and integration with the wider facility.
Regasification and send-out requirements, distribution connections and expansion constraints.
Gas networks, industrial users and gas-to-power applications, with the utilities they need.
Define pressure, flow, utilities and connection responsibilities alongside the wider terminal or gas supply scope.
Equipment image accompanying the Genser pipeline project reference in the EnTech brochure.For EPC contractors, developers and asset owners: select the regional route closest to your project and tell us what you are planning.
For EPCs and owners defining a new terminal, an expansion or an onshore engineering package.
For projects connecting LNG receiving and storage with industrial or power-sector gas demand.
For developers and EPCs connecting LNG infrastructure with gas distribution, industry or power.
Share your project country and current stage to begin the discussion on technical standards, local collaboration and delivery scope.
Selected references from the CIMC EnTech English brochure. Each card identifies the reported package.
Prestressed concrete full-containment storage tanks at the Huizhou LNG receiving station.
Brochure project period: 2021–2024. The reference shown here concerns the storage tanks.An LNG receiving station expansion package focused on outbound transmission capacity.
Brochure records completion in 2024. This package is distinct from the entire receiving station.Terminal expansion EPC including a full-containment LNG tank, public utilities and supporting infrastructure.
Brochure records commissioning on 21 November 2018.Terminal EPC reference; brochure project period 2014–2017.
Phases 1 and 2. Brochure records phase 1 commissioning in 2018 and phase 2 completion in 2021.
Propane and ethane/ethylene storage EPC; Zhejiang, China. Brochure period 2020–2022.
LNG liquefaction plant EPC reference. Brochure records completion in 2024.
Your country, site, project stage, capacity needs and target schedule help define the initial discussion. Existing drawings and technical requirements can follow through an agreed sharing process.
Send a project outline →Discuss engineering, procurement, construction management and commissioning responsibilities alongside the owner and local EPC or design team. Applicable standards, permitting and local design acceptance form part of the project review.
The Genser reference covers natural gas pipeline design, procurement and installation in Ghana. The brochure lists three project phases:
For a new project, define the terminal, pipeline and downstream interfaces together with the relevant project teams.
Discuss your engineering package →Its published capability includes consultation and engineering design, alongside procurement, construction management and commissioning. Share your project stage and requested engineering scope so the appropriate team can review the next step. A specific feasibility or FEED deliverable package is agreed project by project.
Begin with a defined work package, technical requirements and an interface list. Engineering, procurement, construction management and commissioning responsibilities can then be discussed around the contract scope. Local permitting, design acceptance and site responsibilities must be coordinated with the project owner and qualified local parties.
Yes. The brochure lists the Guangdong East LNG receiving station outbound transmission capacity expansion EPC and the Lvsi Port LNG terminal expansion EPC. The referenced work packages differ; a reference to one package does not mean EnTech delivered the entire terminal.
Provide the project country and site, your role, current stage, intended LNG throughput, storage volume and send-out requirements where known. Include existing facilities, downstream demand, utility constraints and your target decision date. Confidential technical documents can follow after the sharing process is agreed.
Yes. This page provides a project inquiry route for EPCs, developers and owners in all three regions. The applicable technical standards, local partners, approval process and delivery responsibilities are reviewed for each project; the regional inquiry route is not a claim of an existing local project reference.