Preliminary LCOE and architecture screening.
Enter the site condition and load profile to generate a first-pass architecture: gas-to-power when molecules are available, or BESS-first hybrid microgrid when storage should lead.
Start with the energy source you can actually secure.
Use the focused route when gas is available, continue with the broader LCOE screen for hybrid projects, or ask CIMC ENRIC to review an uncertain site.
Gas-to-Power assessment
For APG, biogas, CNG, LNG or pipeline gas. Calculate gas demand, logistics, modular generator selection, operating savings and the gas power-generation payback basis.
Open the detailed gas assessment → PV / BESS / hybridIntegrated energy screen
Continue below for first-pass LCOE, PV share, BESS sizing and hybrid microgrid architecture when the project needs multiple energy sources.
Continue to the LCOE screen → Source uncertainTalk to an engineer
Use this route when gas rights, fuel availability, grid condition or project scope still need a technical review before selecting the calculation basis.
Start a project conversation →The gas route and the integrated-energy route remain separate assessments, so the first estimate uses assumptions that match the project you are actually developing.
Estimate the first-pass architecture and optimized LCOE range.
Use this screening tool to describe the site, load and energy source. The result is a preliminary planning range, not a commercial quotation.
Calculating suggested architecture...