Skip to Content
Upcoming event 6th International GNL GLOBAL Forum 2026 | Santiago, Chile | 19-21 October | CIMC ENRIC Sponsor View event detailsEvent details
V-FAT factory portal / Battery storage
CIMC storage manufacturing network

Energy Storage Manufacturing
Factory process & delivery review

Explore production-facility, testing and delivery references from existing CIMC storage material, with the scope of battery, PCS, enclosure, cooling and control integration.

CIMC energy storage production facility shown in existing 2025 reference material
CIMC storage manufacturing reference from existing 2025 material. This is one facility reference within the wider network, not a representation of every production base.
Energy Storage Manufacturing · Factory profile

Factory profile in progress.

Under development

We are building this factory profile with production information, site imagery and supporting documents. Explore the sections below to see what is coming; existing product and manufacturing references continue further down this page.

01Factory at a glancePlanned content

Factory identity and manufacturing role.

  • Manufacturing entity and location
  • Main production or integration role
  • Factory photographs and review date

This part of the factory profile is being prepared.

02What this factory buildsPlanned content

Products, configurations and supplier responsibilities.

  • Battery, PCS, enclosure, cooling and controls; component and system integration responsibilities.
  • Component suppliers and package scope
  • Factory work and site work

This part of the factory profile is being prepared.

03Numbers that matterPlanned content

Product and delivery facts for your purchasing decision.

  • Power and usable-energy basis, selected configuration, test capacity and delivery information.
  • Dated production, delivery or lead-time facts
  • Test capability and current availability

This part of the factory profile is being prepared.

04See the factoryPlanned content

Aerial footage, workshop images and factory walkthroughs.

  • Site overview and aerial footage
  • Workshop walkthrough
  • Dated photographs and short videos

This part of the factory profile is being prepared.

05From incoming material to dispatchPlanned content

The production stages behind the selected equipment.

  • Incoming materials and traceability
  • Assembly and inspection stages
  • Testing, packing and dispatch

This part of the factory profile is being prepared.

06Workshop details that matterPlanned content

A closer look at the workshop and product details.

  • Cable routing, component traceability, thermal interfaces, safety interlocks and shipping protection.
  • Workmanship and protection details
  • Maintenance access and product-specific features

This part of the factory profile is being prepared.

07Assembly and integrationPlanned content

How the selected components and interfaces come together.

  • Core components and suppliers
  • Mechanical, electrical and control interfaces
  • Assembly details and service access

This part of the factory profile is being prepared.

08Testing capabilityPlanned content

Factory test facilities, conditions and scope.

  • Charge/discharge equipment, power and voltage limits, control checks and available test conditions.
  • Relevant test conditions and methods
  • Applicable quality documents and certificate scope

This part of the factory profile is being prepared.

09Project FAT evidencePlanned content

Order-specific acceptance plans and permitted records.

  • Equipment and agreed acceptance plan
  • Permitted order-specific results and witness records
  • Deviation closure and factory/site acceptance scope

This part of the factory profile is being prepared.

10Stock, lead time and deliveryPlanned content

Availability, lead-time basis and shipping scope.

  • Dated model availability and allocation
  • Configuration and quantity-specific lead time
  • Packing, transport and handover interfaces

This part of the factory profile is being prepared.

11Delivery referencesPlanned content

Approved delivery examples for relevant equipment.

  • Approved equipment and project references
  • Configuration, year and delivery scope
  • Customer-approved photographs

This part of the factory profile is being prepared.

12Support after deliveryPlanned content

Service, spares and support for your destination.

  • Warranty and service responsibilities
  • Spares and maintenance support
  • Country-specific partner and training arrangements

This part of the factory profile is being prepared.

13Buyer questions and documentsPlanned content

Answers and approved documents you can use or share.

  • Factory and product questions
  • Approved brochures and shareable buyer brief
  • Technical documents available for your project

This part of the factory profile is being prepared.

14Plan your reviewContact available

Tell us which factory information your project needs.

  • Equipment and country
  • Quantity, operating duty and target delivery
  • Factory information or acceptance evidence you need
Request factory information

New factory content will be added as it becomes available. Planned sections do not establish production figures, stock availability or completed acceptance-test results.

Capability reference

Connect the product to its manufacturing scope.

The existing BESS page includes a CIMC storage production facility, a charge-and-discharge testing area and systems prepared for delivery. The manufacturing overview separately identifies the dates and scope of the storage-network references. Read the published reference →

Use this guide to plan a factory discussion. The selected supplier, component scope, inspection plan and delivery responsibilities are confirmed for the actual project.
Process review map

Follow the route from requirements to handover.

These checkpoints organize a customer review. The order-specific manufacturing and test plan defines the work and acceptance criteria.

01Define the operating duty

Separate power in kW from energy in kWh, then agree voltage, operating modes, ambient conditions and system boundaries.

02Select the system components

Identify battery, PCS, enclosure, cooling, fire-protection and control suppliers for the selected configuration.

03Review system assembly

Discuss mechanical fit, electrical wiring, thermal management, safety interfaces and component traceability.

04Agree functional testing

Define the relevant charge-and-discharge, alarms, interlocks, control and interface checks in the test plan.

05Prepare delivery and commissioning

Review transport conditions, installation work, receiving checks, site integration and final handover.

Existing factory material

See the testing and delivery references.

Source: existing CIMC storage material on our BESS page. The wider network and dated capacity references are explained in Manufacturing and Delivery Capabilities.

Buyer review brief

Know what evidence to ask for.

Bring the selected equipment and operating requirements to the discussion. Agree the relevant documents, confidentiality, witness points and handover scope with the project team.

  • Power and energy specification with operating assumptions
  • Selected component list and supplier responsibilities
  • Layout, electrical and thermal-interface drawings
  • Order-specific factory test plan and reports
  • Transport, installation and commissioning scope
Customer questions

Questions before a factory review.

Does storage-system manufacturing include battery-cell manufacturing?

Not necessarily. Cell manufacture, battery assembly, enclosure fabrication and full-system integration are distinct activities. Confirm the supplying entities and the exact factory scope for your selected system.

What does the virtual factory showcase prove?

It provides reference images and a structured review route. Confirm current facility scope, the proposed production slot and order-specific quality evidence with the project team; the showcase alone is not a capacity or delivery commitment.

Find answers for your customer role and project →

The complete energy system

Connect this route with the other factory capabilities.

Reference review: 4 October 2026. Published references identify the relevant entity; the project team confirms the contracted suppliers and scope.