CIMC open platform · Energy & infrastructure
What Else Can We Do?
What we have done indicates what else we can do.
Bring your technology, your operating challenge or your next market. Let’s co-create storage, data-center energy, gas-to-power and the infrastructure around them.
27 visual stories. 11 chapters. Discover the companies, engineering and milestones behind CIMC — from modular data centers and LNG infrastructure to airports and global logistics.
Allow about 30 minutes. Swipe, open a story and save the capabilities that matter to you.
Malaysia 2312 modular data center · CIMC Construction · photo: CIMC Group
The shipping container was invented to move things. Today, what goes inside the box keeps finding new jobs — batteries, controls, power conversion, living modules, data halls, and ideas we have not built yet. CIMC is an open platform: you bring the application; we engineer and manufacture the enclosure and the integrated equipment around it.
Across a five-base energy storage network — Qingdao, Nantong, Yangzhou, Fujian, plus Baotou, Inner Mongolia as the fifth base — and related Group manufacturing for modular buildings and rapidly deployable energy equipment, we can go beyond a single storage cabin. A proven design and sustained demand can support a dedicated production line, subject to engineering review and an agreed production plan.
Five bases: capacity references and dates
Qingdao, Nantong, Yangzhou and Fujian appear in the CIMC Energy Storage English presentation (June 2025, slide 12), with 40+ GWh stated annual production capacity for that four-base network. Baotou was reported as the fifth base at commissioning on 16 September 2026, with 15 GWh Phase I annual storage-system delivery capability; Phase II is planned for 2027. These references describe the CIMC storage network; they are not the annual output of CIMC Enric Energy Systems (Shanghai) Co., Ltd. Confirm project capacity, delivery slots and supply scope for the actual order. Full evidence: Manufacturing capabilities.
Open to your technology and your market
Three energy directions. One invitation to build together.
You may already have the battery, engine, cooling technology or local customer. We can develop the manufacturing and system interfaces around it, with the relevant CIMC teams and an agreed delivery scope.
Storage & microgrids
Your application. An integrated energy system.
Bring: a battery or PCS platform, the load profile, grid conditions and your operating goals.
Explore together: battery enclosures, BMS/PCS/EMS interfaces, thermal management, protection and integration with solar or generation. Start with a reviewed design and pilot.
Bring: IT load, rack density, cooling requirements and the redundancy philosophy.
Explore together: modular data halls, power and cooling modules, UPS/BESS interfaces, gas generation and energy controls. Agree the interfaces between equipment, building and operator.
From available fuel to useful electricity and heat.
Bring: the fuel supply, gas analysis, site demand and local service capability.
Explore together: fuel handling, gas conditioning, containerized generation, heat recovery where suitable, distribution and hybrid controls. Develop an engine and fuel package for the actual duty.
OEMs, technology partners, developers, EPCs and local dealers are welcome. Engineering review defines compatibility, approvals, responsibilities and the commercial scope.
Our own direction · From equipment to an operating system
Africa: build the whole energy chain.
A generator is one part of the project. Fuel access, conditioning, electrical integration and local service determine whether the system can keep supplying the customer. This is the integrated approach we are advancing with project owners and local partners.
Nigeria · Contract signed · Under execution
Associated gas to power: customized AM600
Our Nigeria project combines two associated-gas sources — U1 separator gas and U4 low-pressure separator gas — with the fuel collection and conditioning interfaces needed for containerized AM600 generation.
The project scope connects gas handling, pressure and liquid management, generation, controls and site integration. The public case records a signed contract under execution.
AM20 factory acceptance inspection before shipment, from our signed telecom case. This is a factory view.
LNG storage, vaporization, pressure control, gas generation and controls come together in one compact skid. This equipment approach provides a starting point for telecom, small commercial and distributed-energy discussions.
01 · FuelPipeline gas, associated gas or delivered LNG; establish availability and quality.
02 · PrepareStorage or vaporization, pressure control and conditioning as required.
03 · GenerateMatch the gas engine and modular package to the continuous load and site.
04 · BalanceAssess BESS and solar where they improve the operating profile.
05 · DeliverDistribution, protection and controls connect generation to customer loads.
06 · SupportCommissioning, operator training, spare parts and local maintenance responsibilities.
Engineering concept · Larger-scale route
From a first package to a phased power plant
Our Nigeria 25 MW pipeline-gas page presents a modular plant concept and an expansion approach. It illustrates how the same fuel-to-load logic can support a larger project; the page describes a planning reference.
A local developer or dealer brings customer demand, fuel access, site permissions and service coverage. We develop the equipment and integration scope together, then agree factory acceptance, commissioning and pilot operating records before replication.
The AM600 reference is under execution. The 25 MW page is an engineering concept. Operating results and repeat deployment plans will be added as verified project milestones become available.
What we’ve done
Explore manufacturing references from CIMC Group companies. CIMC ENRIC Energy Systems can help connect your application with the relevant manufacturing and integration teams; the responsible supplier and delivery scope are agreed for each project.
Lead case — Supporting electromechanical cabins for a global wind OEM (Vestas)
CIMC Group · CIMC Yangzhou
For a global wind energy OEM, CIMC Yangzhou helped turn large wind-turbine nacelle functions into modular cabins sized for industrial logistics — including side cabins with integration of internal electrical equipment. The modular side nacelles combine engineered enclosures and internal electrical equipment integration, with dimensions designed for road, rail and ocean logistics before assembly into the nacelle system.
Wind turbine nacelle system testing. Photo: CIMC Yangzhou. CIMC Group manufacturing reference.
Public timeline (dated facts only)
When
What (as stated in public sources)
Source
Sep 2021
After nearly a year of review, CIMC Yangzhou became Vestas’ strategic partner for modular manufacturing of wind-power equipment, covering modular nacelles and side-nacelle internal integration.
Why this matters here: A world-class wind OEM trusted CIMC’s box-and-integration craft. That proves the platform can host demanding electromechanical payloads.
A wider CIMC engineering platform
What happens when capability meets a new application?
Storage containers and modular buildings are part of the story. Airports, offshore platforms and tourism vessels show how CIMC companies also combine equipment, operating needs and partner expertise beyond the container. The references below identify the company and the dated project stage.
CIMC Yangzhou · Published OEM references
An enclosure platform for storage and generation
Yangzhou’s 2022 account names storage containers for Narada Power and Trina Solar, modular generator enclosures for Aggreko and MTU, and electrical boxes for GE. These are enclosure and integration manufacturing references.
What we could explore together: Combine your battery, engine or power-conversion technology with a transportable enclosure, thermal design, service access and factory integration.
Malaysia 2312 modular data center. Photo: CIMC Group, November 2024.
CIMC’s November 2024 report describes the Malaysia 2312 project: 833 modules and about 60 MW IT load. The first two buildings were operating at the report date. CIMC Construction undertook modular design, manufacturing, installation and commissioning.
What we could explore together: Develop the energy backbone around compute demand: power modules, cooling, storage and generation interfaces, with responsibilities agreed across building and equipment teams.
Xi’an T5 airport equipment. Photo: CIMC Group, February 2025.
CIMC reported 102 boarding bridges supplied by TianDa and 125 bridge-mounted aircraft air conditioners supplied by CIMC at Xi’an Xianyang Airport’s T5. The February 2025 account also describes airport equipment maintenance support.
What we could explore together: Assess an airport’s cooling and electrical loads, backup power and storage operation as one system. Mechanical access equipment and thermal services already work together at the gate.
Raffles’ July 2026 account describes a collaboration between Shanghai Jiao Tong University, CIMC Raffles and Jinghai Fishery: research informs design, Raffles engineers and assembles the equipment, and operating data feeds the next iteration. Eight Jinghai cages had been built.
What we could explore together: Design reliable power for feeding, monitoring, communications and related onshore cold-chain loads. Use operator feedback to refine the energy package alongside the farming equipment.
The 2018 joint-design announcement brought aquaculture and visitor facilities onto one platform. Its design included solar and diesel generation, automatic feeding and underwater monitoring. Yantai’s tourism bureau later documented the Genghai tourism service platform in November 2024.
What we could explore together: Coordinate production loads and visitor services: generation, solar, storage where appropriate, monitoring and the electrical demand of a marine destination.
Xunxian 5, from the 2017 delivered tourism-vessel reference. Photo: CIMC Group.
In June 2017, Raffles delivered two Xunxian cruise vessels and four Qiuxian yachts to Xinyi, a Beibu Gulf Tourism subsidiary. Raffles, the tourism group and China Classification Society also signed a marine-tourism equipment innovation framework.
What we could explore together: Connect transport, destination facilities and their energy demand: shore power, cooling and service infrastructure, with marine requirements defined for the actual project.
CIMC Raffles + Zhonglin Green Carbon · Demonstrator
Jilin No.1: new materials meet offshore solar
The partners jointly developed a bamboo-composite floating photovoltaic platform. CIMC’s November 2023 announcement records its launch, tow and offshore installation for validation at the Yantai demonstration site.
What we could explore together: Investigate offshore renewable generation with marine structures and materials, then assess storage and electrical interfaces for the intended loads.
CIMC’s June 2025 announcement records the Earth Riyadh Hotel contract, using 104 modules. The report set a 2026 completion target; this reference describes the announced contract.
What we could explore together: Plan modular hospitality buildings together with cooling, hot water, electrical supply and backup power. Evaluate heat recovery when fuel and demand make it suitable.
The “What we could explore together” paragraphs are invitations for new energy-system development. The cited projects establish the stated manufacturing or project role; the energy extensions are developed for a new customer’s requirements.
Platform repurposing: a signed marine-tourism development route
In December 2020, CIMC Raffles and Yantai Yeda Tourism Group signed an agreement to establish a project company for a marine-tourism development using the Prometheus semi-submersible accommodation platform. The announcement describes the proposed transformation into hospitality and cultural facilities.
Open cooperation also includes technology partners and delivery logistics
CIMC and Midea’s 2026 strategic agreement covers areas including green buildings, energy storage and manufacturing. Separately, CIMC Wetrans reported completed cross-border logistics for the CEEC–CATL Uzbekistan storage project. Technology cooperation and getting equipment to site are both part of turning a design into a project.
What could we build together? These are starting points for an engineering discussion. Product configuration, approvals and delivery scope are developed for the application.
Hybrid island / microgrid “plug-and-play” energy rooms
Rapid-deploy buffer power for mining, construction, or events
Data-centre or edge-compute energy skids with cooling and fire interfaces
Hydrogen / CNG / LNG adjacent skids where enclosure and integration matter
Site camps and modular buildings with an energy backbone
Something we have not listed — your idea
If it needs a well-built box and a factory that can go from prototype to volume: it belongs in this conversation.
Share the idea — sketch, problem, market, or photo. No formal RFQ required to start.
Engineering talk — separate custom work from proven enclosure practice.
Prototype — first article or small batch for field testing.
Scale — agree the product, quality plan and volume requirements. Dedicated production capacity can be evaluated as demand grows.
Bring us your idea matters as much as placing an order.
Questions
What does “CIMC as an open container platform” mean for my energy project?
The container’s job used to be moving cargo. Now the valuable part is often what you put inside — batteries, switchgear, controls, living modules, data halls. CIMC engineers and manufactures the enclosure and integration interfaces; you define the payload. What we have already built indicates what else we can build with you.
Is the Vestas modular nacelle cabin a CIMC ENRIC Energy Systems project?
No. It is a CIMC Group · CIMC Yangzhou manufacturing collaboration with Vestas (public sources from 2021 onward). We share it as proof of Group capability — not as our own EPC case history.
We have an idea for a new energy container, but not a big order yet. Should we still contact you?
Yes. WhatsApp (+86 156 1864 9185) or email [email protected]. Engineering discussion and prototype first; dedicated production capacity can follow if volume grows.
What are the “five bases” mentioned on this page?
See manufacturing capabilities: Qingdao, Nantong, Yangzhou, Fujian (June 2025 presentation, slide 12; 40+ GWh) plus Baotou (commissioned 16 September 2026; 15 GWh Phase I). CIMC storage network references, not CIMC Enric Energy Systems output.
Can we bring our own battery, engine, PCS or cooling technology?
Yes. Bring the equipment specifications, interfaces, load profile and target market. We can discuss enclosure design, factory integration and system coordination with the relevant teams. Compatibility, approvals, testing and the responsible supply scope are agreed through engineering review.
How are you advancing integrated energy projects in Africa?
Our Nigeria AM600 associated-gas project has a signed contract and is under execution. It connects fuel handling and conditioning with containerized generation and site integration. We also develop modular LNG-to-power packages and larger plant concepts. Each rollout needs a defined fuel supply, electrical design, commissioning plan and local service responsibilities.
Who delivered the airport, aquaculture and modular-building references?
These are references from the identified CIMC Group companies, including TianDa, Raffles, Yangzhou, CIMC Construction and MBS. CIMC ENRIC Energy Systems can coordinate a new energy-system discussion with the relevant teams. The responsible supplier and contract scope are agreed for each new project.
Let’s build something together.
Tell us what you want to build and how to reach you. A short summary is enough to start the conversation.
Thank you — your idea has been received.
Our team will review your inquiry and contact you using the details you provided. Keep the conversation going on WhatsApp if you would like to share more context.
Your role: developer, OEM, EPC, dealer or end user.
Application and location: what the system needs to do and where it will operate.
Equipment and interfaces: power, cooling, controls, dimensions and any transport constraints.
Scale and timing: prototype or initial batch, expected future demand and target delivery.
Project stage: concept, design development, sourcing or field trial.
Share only the information appropriate for an initial discussion. If drawings need confidentiality protection, ask us to agree that before sending them.
CIMC ENRIC Energy Systems — gas-to-power, CNG/LNG stations, BESS, diesel-power buffer containers, modular data-centre energy, and overseas markets. When your idea needs Group enclosure or modular capability, we coordinate within CIMC so the right base helps build it.