Skip to Content
Upcoming event 6th International GNL GLOBAL Forum 2026 | Santiago, Chile | 19-21 October | CIMC ENRIC Sponsor View event detailsEvent details

AM modular gas generation

AM600 and AM1200.
Power blocks around your site.

Compact equipment packages connect gas supply, generation and the site's electrical system. Select the module around your fuel, load, operating duty and delivery conditions.

Two modular routes

AM600

600 kW · Single 20-ft high-cube package

A standard high-cube package brings the generation block into one transportable unit. Factory packaging helps organize deployment for oilfield, remote and distributed loads.

See the signed Nigeria AM600 project →

AM1200

1.2 MW · Modular power block

Use multiple modules to develop a larger plant with an agreed reserve philosophy, gas-supply route, control system and electrical interface plan.

Explore the 10 MW-class expansion concept →

These are the AM600 and AM1200 product-route capacities presented on this website. The selected fuel version, rated duty, ambient conditions, gas quality and final configuration determine the applicable project data sheet and site output.

What plug-and-play means at the site

A packaged AM600 keeps the main generation block compact. Site preparation still includes unloading and foundations, fuel connections, electrical cables and switchgear interfaces, ventilation clearances, applicable permits and commissioning.

Read the site-preparation answer →

Connect the modules into a power system

  • Fuel route: assess supply pressure, gas composition, contaminants, continuity and the required preparation equipment.
  • Power route: confirm voltage, frequency, continuous and peak loads, motor starting and grid or island operation.
  • Reserve and controls: define the available units, maintenance plan, existing generators, BESS interfaces and dispatch responsibilities.
  • Delivery: define equipment supply, factory tests, logistics, local works and site acceptance.

Explore the gas-to-power system → · Consider BESS and microgrid integration →

Need larger units for long-hour operation?

The SL product route extends the generation discussion to larger units. Fuel suitability, gas preparation, operating duty and interfaces are assessed for each project.

View the SL2000-NG product →

Start with your site information

Send the country, load profile, gas analysis and supply conditions, voltage and frequency, ambient conditions, operating hours and required supply scope. An initial configuration discussion can then identify the relevant product documents and project assumptions.

Discuss an AM configuration →

Product-route overview reviewed: 4 October 2026. The linked project and expansion concept retain their stated stages; neither is a universal performance guarantee.