Skip to Content
Upcoming event 6th International GNL GLOBAL Forum 2026 | Santiago, Chile | 19-21 October | CIMC ENRIC Sponsor View event detailsEvent details

Diesel-side power buffer | CIMC ENRIC

Tier-one partnerxCIMC ENRIC

A 10ft-class buffer wherever diesel meets load

Compact liquid-cooled storage beside the genset - cut fuel waste, ride shock loads, keep critical loads online. Reference cabinet: tier-one partner TRENE-P500B1044L-2H (~500 kW / 1044 kWh). Also ties to PV and other site sources.

ReferenceTRENE-P500B1044L-2H
Power / energy~500 kW / 1044 kWh
ParallelUp to 5 units
Backup window2-4 hours (SKU)

Why a buffer

Fuel and capacity buffering - not a marine BESS story

Wherever diesel (or weak grid) meets impact loads, a compact liquid-cooled cabinet absorbs peaks, fills valleys, and keeps critical loads online. Broad push for diesel, PV, storage and integrated energy-system customers.

Pain points

  • Sets idle or run oversized - fuel waste on temporary and remote sites.
  • Cranes, welders, pumps and compressors create shock loads that trip small transformers.
  • Pure container BESS pitches miss the job: buffer beside diesel / PV / weak grid - not Expo megawatt standby competition.

Co-brand path

  • Tier-one partner PCS / EMS / BMS liquid-cooled cabinet as the power electronics + battery platform.
  • CIMC ENRIC overseas sales, scheme, and enclosure/integration when the project needs the box.
  • Honest line: datasheet numbers are the reference platform; final scheme follows site load profile.

Two scenarios

Diesel-storage microgrid | Weak-grid boost

Same cabinet class; different site logic. Scheme-first - share load curve and fuel/source before we lock a SKU.

A. Diesel-storage microgrid

Pair the buffer with on-site diesel. Charge on low load so the genset stays in its efficient band; discharge on peaks so you can avoid oversizing and burn less fuel. PV can join the same bus where the site allows.

B. Weak-grid / transformer boost

When transformer capacity is short, the buffer supplements heavy loads and rides through impact. Optional peak-shaving where tariffs apply.

Construction / tempBest first storytelling frame
Ports / quayDiesel + impact loads
EventsShort cycles, fuel cost
Mine / campRemote diesel microgrid
Weak-grid factoryTransformer headroom

Reference platform | Partner datasheet

TRENE liquid-cooling ESS family (verified numbers only)

Figures below are copied from the partner TRENE-P500B1044L-2H datasheet (V1.0). Same-platform 249-499 kW options share 1044 kWh and the cabinet envelope. Not a firm quote - scheme follows site load.

Family overview

ModelRated ACBackup classBattery
TRENE-P500B1044L-2H500 kW2HLFP 314 Ah | 1044 kWh
TRENE-P499B1044L-2H499.6 kW2HLFP 314 Ah | 1044 kWh
TRENE-P399B1044L-2.5H399.6 kW2.5HLFP 314 Ah | 1044 kWh
TRENE-P319B1044L-3H319.6 kW3HLFP 314 Ah | 1044 kWh
TRENE-P260B1044L-4H260 kW4HLFP 314 Ah | 1044 kWh
TRENE-P250B1044L-4H250 kW4HLFP 314 Ah | 1044 kWh
TRENE-P249B1044L-4H249 kW4HLFP 314 Ah | 1044 kWh

AC side (on-grid) - shared

Rated AC voltage3 / N / PE, 230/400 V or 220/380 V
AC voltage range340 ~ 440 V
Rated AC frequency50 Hz / 60 Hz
Power factor-1 ~ +1
THDi (rated)< 3%
DC component< 0.5%

AC side (off-grid) - shared

Rated AC output voltage3 / N / PE, 230/400 V or 220/380 V
THDv (linear load)< 3%
Unbalance load capacity100%
Overloading110% long term; 120% 1 min

DC / system

Battery typeLFP / 314 Ah
Battery capacity1044 kWh
Rated battery voltage832 V
Battery voltage range689 - 936 V
Dimensions (WxHxD)2991 x 2896 x 2438 mm
Weight~13 t
Operating temperature-30 ~ 55 deg C (>45 deg C derating)
CoolingLiquid cooling
Ingress protectionIP55 (IP66 noted for some modules on cover)
ParallelMaximum 5 units
CommunicationEthernet | Modbus TCP
Anti-corrosionC4 (C5 optional)
Safety configurationGas + water-based fire suppression + ventilation (+ optional explosion-proof plates)
Datasheet PDF: upload pending on site - full AC/DC/system tables are on this page from the partner TRENE V1.0.
Scheme-first: ask for load profile, fuel/source and site conditions before locking SKU, parallel count or delivery. Datasheet figures are the partner reference platform - not invented kW and not a commercial offer by themselves.
Partnership timeline: Strategic partner x CIMC ENRIC | General BESS: BESS & microgrid

Next step

Share load, fuel and site - we size the buffer scheme

Commercial: Noah Wang | CIMC ENRIC Energy Systems | [email protected]

Diesel power buffer | CIMC ENRIC Energy Systems | Reference platform TRENE-P500B1044L-2H+86 156 1864 9185