V-FAT factory portal / Fuel preparation
CIMC Enric engineering and equipment capability

Gas Processing & Liquefaction
Factory process & delivery review

Follow the review path from feed-gas conditions and process design to packaged equipment, controls, factory checks and the interfaces that need completion at the project site.

Gas Processing & Liquefaction · Factory profile

Factory profile in progress.

Under development

We are building this factory profile with production information, site imagery and supporting documents. Explore the sections below to see what is coming; existing product and manufacturing references continue further down this page.

01Factory at a glancePlanned content

Factory identity and manufacturing role.

  • Manufacturing entity and location
  • Main production or integration role
  • Factory photographs and review date

This part of the factory profile is being prepared.

02What this factory buildsPlanned content

Products, configurations and supplier responsibilities.

  • Feed-gas and process packages; skid, vessel, piping and control responsibilities.
  • Component suppliers and package scope
  • Factory work and site work

This part of the factory profile is being prepared.

03Numbers that matterPlanned content

Product and delivery facts for your purchasing decision.

  • Selected process duty, feed conditions, utilities and configuration-specific delivery information.
  • Dated production, delivery or lead-time facts
  • Test capability and current availability

This part of the factory profile is being prepared.

04See the factoryPlanned content

Aerial footage, workshop images and factory walkthroughs.

  • Site overview and aerial footage
  • Workshop walkthrough
  • Dated photographs and short videos

This part of the factory profile is being prepared.

05From incoming material to dispatchPlanned content

The production stages behind the selected equipment.

  • Incoming materials and traceability
  • Assembly and inspection stages
  • Testing, packing and dispatch

This part of the factory profile is being prepared.

06Workshop details that matterPlanned content

A closer look at the workshop and product details.

  • Piping and instrument identification, material records, skid interfaces and maintenance access.
  • Workmanship and protection details
  • Maintenance access and product-specific features

This part of the factory profile is being prepared.

07Assembly and integrationPlanned content

How the selected components and interfaces come together.

  • Core components and suppliers
  • Mechanical, electrical and control interfaces
  • Assembly details and service access

This part of the factory profile is being prepared.

08Testing capabilityPlanned content

Factory test facilities, conditions and scope.

  • Package test facilities, available utilities and demonstrations requiring site conditions.
  • Relevant test conditions and methods
  • Applicable quality documents and certificate scope

This part of the factory profile is being prepared.

09Project FAT evidencePlanned content

Order-specific acceptance plans and permitted records.

  • Equipment and agreed acceptance plan
  • Permitted order-specific results and witness records
  • Deviation closure and factory/site acceptance scope

This part of the factory profile is being prepared.

10Stock, lead time and deliveryPlanned content

Availability, lead-time basis and shipping scope.

  • Dated model availability and allocation
  • Configuration and quantity-specific lead time
  • Packing, transport and handover interfaces

This part of the factory profile is being prepared.

11Delivery referencesPlanned content

Approved delivery examples for relevant equipment.

  • Approved equipment and project references
  • Configuration, year and delivery scope
  • Customer-approved photographs

This part of the factory profile is being prepared.

12Support after deliveryPlanned content

Service, spares and support for your destination.

  • Warranty and service responsibilities
  • Spares and maintenance support
  • Country-specific partner and training arrangements

This part of the factory profile is being prepared.

13Buyer questions and documentsPlanned content

Answers and approved documents you can use or share.

  • Factory and product questions
  • Approved brochures and shareable buyer brief
  • Technical documents available for your project

This part of the factory profile is being prepared.

14Plan your reviewContact available

Tell us which factory information your project needs.

  • Equipment and country
  • Quantity, operating duty and target delivery
  • Factory information or acceptance evidence you need
Request factory information

New factory content will be added as it becomes available. Planned sections do not establish production figures, stock availability or completed acceptance-test results.

Capability reference

Connect the product to its manufacturing scope.

CIMC Enric's published upstream portfolio includes natural-gas liquefaction plants, wellhead gas recovery packages, heat exchangers and tower pressure vessels. Read the published reference →

Use this guide to plan a factory discussion. The selected supplier, component scope, inspection plan and delivery responsibilities are confirmed for the actual project.
Process review map

Follow the route from requirements to handover.

These checkpoints organize a customer review. The order-specific manufacturing and test plan defines the work and acceptance criteria.

01Characterize the feed gas

Review gas composition, contaminants, flow variation, pressure and the required product specification.

02Define the process package

Confirm process boundaries, utilities, equipment selection and the division between factory and site work.

03Review equipment assembly

Discuss skids, vessels, piping, instrumentation and control integration for the agreed package.

04Agree factory checks

Define component inspections, interface checks and tests that can be completed before shipment.

05Plan site integration

Prepare utilities, foundations, tie-ins, commissioning responsibilities and operator handover.

Buyer review brief

Know what evidence to ask for.

Bring the selected equipment and operating requirements to the discussion. Agree the relevant documents, confidentiality, witness points and handover scope with the project team.

  • Feed-gas and design basis
  • Process flow and package boundary drawings
  • Utilities and site-interface schedule
  • Inspection and test plan for the selected equipment
  • Commissioning and operator-handover scope
Customer questions

Questions before a factory review.

Can every part of a liquefaction plant be tested at the factory?

The test scope depends on the package, utilities and operating conditions available. Agree what will be inspected or tested before shipment and what must be demonstrated during site commissioning.

What should we prepare before a factory review?

Provide the feed-gas analysis, required output, utilities, site conditions and project boundaries. These help the team identify the relevant equipment and technical records.

Find answers for your customer role and project →

The complete energy system

Connect this route with the other factory capabilities.

Reference review: 4 October 2026. Published references identify the relevant entity; the project team confirms the contracted suppliers and scope.