What is a China-style virtual gas pipeline?

A China-style virtual gas pipeline is a project approach that combines road-delivered LNG or CNG with modular receiving, gas conditioning and, when needed, on-site heat or power. CIMC ENRIC uses the term for an integrated delivery model that can serve sites before a permanent gas or electricity connection is available.

From gas source to a working site

Secure supply

A local supplier confirms gas quality, contracted volume, loading capacity and continuity. Start with a measurable anchor load such as a factory or mine.

Deliver and receive

Compare LNG in cryogenic tanks or ISO tank containers with CNG in tube trailers. Size the route from usable payload, turnaround, site access and reserve. Specify receiving, vaporization for LNG or pressure reduction for CNG, and metering.

Convert at the load

Supply process heat or deploy containerized gas generation. Add PV, batteries and controls where hourly demand and the dispatch strategy justify them.

Expand or redeploy

Review nearby customers and fleet demand as a separate workstream. After a permanent connection arrives, qualified modules may remain for backup or move to another suitable site.

What does the integrated approach add?

Project boundaryRoad-delivered gasIntegrated gas-to-site energy
OutputGas at an agreed receiving boundaryGas, useful heat or electricity at the agreed site boundary
Design inputsDelivered gas volume, pressure, quality and frequencyThose inputs plus load profile, fuel conversion, controls, reserve and service responsibilities
TransitionAdjust delivery as demand or access changesPlan how transportable receiving and power modules could stay in service or be redeployed

The approach connects functions that can otherwise be specified separately. Its value depends on the delivered cost, operating schedule, permits and the alternatives available at the site. Confirm compatibility, lifting, transport and recommissioning before committing to reuse.

Answers for project teams

Can it bridge the wait for a pipeline or grid connection?

Yes, where the gas supply, receiving site, power demand and approvals support an interim deployment. Compare the expected operating window, demobilization cost and the next use of the equipment before ordering.

When should a project choose LNG or CNG?

Compare the available loading source, usable energy per trip, loaded trips per day, route access, fuel handling, receiving investment and reserve at equal service levels. Distance and scale matter alongside local prices and delivery reliability.

Can the same network serve a fleet?

It can be evaluated when the industrial load provides a stable base. Confirm fleet demand, compatible fuel type and separately engineered dispensing, metering and approvals before counting additional volume.

What should the customer send first?

Send the country and site location, peak and average load, operating hours, existing fuel cost, a potential gas source or supplier quotation, delivery distance, required autonomy and any known connection date. Identify whether you need fuel, heat or electricity at the delivery boundary.

Discuss a virtual gas pipeline project

Calculators and project guides

Technical reference: U.S. Department of Energy, LNG Basics describes LNG storage, transport and regasification. The integrated project model described here is CIMC ENRIC’s approach.