CIMC ENRIC · Gas infrastructure and site energy
What is a China-style virtual gas pipeline?
A China-style virtual gas pipeline is a project approach that combines road-delivered LNG or CNG with modular receiving, gas conditioning and, when needed, on-site heat or power. CIMC ENRIC uses the term for an integrated delivery model that can serve sites before a permanent gas or electricity connection is available.
From gas source to a working site
Secure supply
A local supplier confirms gas quality, contracted volume, loading capacity and continuity. Start with a measurable anchor load such as a factory or mine.
Deliver and receive
Compare LNG in cryogenic tanks or ISO tank containers with CNG in tube trailers. Size the route from usable payload, turnaround, site access and reserve. Specify receiving, vaporization for LNG or pressure reduction for CNG, and metering.
Convert at the load
Supply process heat or deploy containerized gas generation. Add PV, batteries and controls where hourly demand and the dispatch strategy justify them.
Expand or redeploy
Review nearby customers and fleet demand as a separate workstream. After a permanent connection arrives, qualified modules may remain for backup or move to another suitable site.
What does the integrated approach add?
| Project boundary | Road-delivered gas | Integrated gas-to-site energy |
|---|---|---|
| Output | Gas at an agreed receiving boundary | Gas, useful heat or electricity at the agreed site boundary |
| Design inputs | Delivered gas volume, pressure, quality and frequency | Those inputs plus load profile, fuel conversion, controls, reserve and service responsibilities |
| Transition | Adjust delivery as demand or access changes | Plan how transportable receiving and power modules could stay in service or be redeployed |
The approach connects functions that can otherwise be specified separately. Its value depends on the delivered cost, operating schedule, permits and the alternatives available at the site. Confirm compatibility, lifting, transport and recommissioning before committing to reuse.
Answers for project teams
Can it bridge the wait for a pipeline or grid connection?
Yes, where the gas supply, receiving site, power demand and approvals support an interim deployment. Compare the expected operating window, demobilization cost and the next use of the equipment before ordering.
When should a project choose LNG or CNG?
Compare the available loading source, usable energy per trip, loaded trips per day, route access, fuel handling, receiving investment and reserve at equal service levels. Distance and scale matter alongside local prices and delivery reliability.
Can the same network serve a fleet?
It can be evaluated when the industrial load provides a stable base. Confirm fleet demand, compatible fuel type and separately engineered dispensing, metering and approvals before counting additional volume.
What should the customer send first?
Send the country and site location, peak and average load, operating hours, existing fuel cost, a potential gas source or supplier quotation, delivery distance, required autonomy and any known connection date. Identify whether you need fuel, heat or electricity at the delivery boundary.
Discuss a virtual gas pipeline projectCalculators and project guides
- Gas-to-Power Calculator for fuel demand, logistics and scenario screening.
- Project Calculator to compare electricity cost from stated assumptions.
- Virtual gas networks for industrial sites.
- How many CNG trailers does a virtual pipeline need?
- How much LNG storage does a generator need?
- European biomethane delivery and Latin American virtual gas networks.
Technical reference: U.S. Department of Energy, LNG Basics describes LNG storage, transport and regasification. The integrated project model described here is CIMC ENRIC’s approach.